Gas Compressor StationKaradag Gas Compressor Station Client : Azerigaz Main Contractor : Mitsui - TOYO Consortium Key Designer : TOYO Source of Fund : Japanese Bank of International Corporation Consultant : Burns and Roe Enterprises, Inc. Start Date : January 2002 Finish Date : October 2003 Key features of Work Scope: The compressor station received natural gas from SOCAR treatment plant and delivered compressed natural gas into a 90 km long pipeline feeding the Severnaya Power Plant. TML-Borova’s scope of work mainly comprised: · Construction of the Compressor station that consisted of: · Two gas turbine driven (approx. 11 MW each) compressors each rated at 5 million m3 /day at 37 barg discharge pressure to deliver natural gas to the Severnaya Power Plant, · Air/Gas coolers for intermediate and after cooling, · Emergency auxiliary diesel/gas generator set, · High voltage electrical connection to the power supply including the aerial line connection and high voltage switching system, · Microprocessor based automatic control system, · Required Auxiliaries. · Major Civil Work Items: · Mechanical Installation Work of nearly 600 tons (major items: Compressor& Blower of 200 tons, Air Fin Cooler of 200 tons, Vessel & Tanks of 120 tons, Platform of 50 tons), · Electrical (90 km of cabling) and Instrumentation (500 no of indoor and outdoor instruments) Installation Works, · Design, Supply and Installation of HVAC System, Telephone System, Lightning System, Steel Structure Erection, · Supply of Electrodes, Paint, Cables, some Structural Steel and Architectural Materials, · Assistance to Commissioning
|