![]() | Misurata Berths Project |
![]() | Marine Works in Mostaganem |
![]() | Offshore Works Of Doha Plant |
![]() | Jetty 2 at Tobruk Terminal |
![]() | Construction of Bulk Berth No.2 and Loading Berth |
![]() | Repair Works of LISCO in Libya |
![]() | Jetty at Tobruk Terminal |
![]() | Repairing of The Berths No.15-33 at Tripoli Harbor |
![]() | Abu Taraba Desalination |
![]() | Breakwater Crown Wall |
![]() | Foça WWTP& Sea Outfall |
![]() | Misurata Oil Jetty Project |
![]() | Misurata Steel Harbour |
|
Construction of Bulk Berth No.2 and Loading BerthConstruction of Bulk Berth No.2 and Loading Berth Client : LISCO – Libyan Iron and Steel Co. Key Designer : Optimum Engineering Consultant : Niras Start Date : March 2008 Finish Date : May 2010 Key features of Work Scope: Construction of 512 m long Bulk Berth and 196 m long Loading Berth along main breakwater of LISCO Port. Repair of the existing bulk berth (Bulk Berth no 1) was also included in the work scope. The works that are going to be performed for the construction of the berths were as follows: · Driving of structural 48' OD steel piles with 17.000 m total length and construction of concrete deck surface with precast members and cast-in situ concrete, · Partly dismantling and re-instatement of existing slope protection plus supply and installation of additional layers where necessary, · Supplying and installation of marine fittings consisting of bollards, storm bollards, safety rails and guard rails, · Supplying and installation of rubber fenders for existing Bulk Berth No 1, Bulk Berth No 2 and Loading Berth, · Applying cathodic protection to all exposed ferrous members including steel piles, · Supplying and installation of Laser Vessel Docking System, · Supplying and installation of crane rails for existing Bulk Berth No 1 and Bulk Berth No 2, · Execution of all necessary landworks ,electrical and mechanical works stated in the contract regarding the approved projects. |