Tobruk Al Massira Hotel
Al Massira Hotel, Tobruk
Client : Social Security Fund
Start Date : August 2008
Finish Date: June 2010
Key features of Work Scope:
The project consisted of the refurbishment works of the Hotel Al Massira which is located in Tobruk, Libya.
The Hotel Complex includes 88 twin-rooms, 28 double-rooms, 8 suites, 2 presidential suites, 16 studio type rooms, 2 studio type presidential suites, and 17 villas and will serve for 356 beds.
The hotel complex encloses a total of 16.000 m2 area for public and general service areas in addition to a cinema and a conference hall, each with a capacity to hold approximately 200 attendees.
The necessary works to be done for the renovation of the Hotel were:
· Renovation of the finishing works (wall – floor – ceiling finishes, woodworks and metal works, etc.),
· Renewal of external and internal doors and windows,
· Replacement of existing roof insulation system,
· Installation of new electro-mechanical systems (i.e. heating, ventilation, air conditioning, electrical systems),
· Refurbishment of external facilities; roads, pavements, plants, fountains, walking paths, tennis courts, pool side snack bar, enclosed barbeque area, sauna-changing areas and the outdoor swimming pool areas had comprised the total of 30.000 m2 external construction area.
· Supply of furniture, kitchenware, laundry equipment etc.