Gas Compressor Station
Karadag Gas Compressor Station
Client : Azerigaz
Main Contractor : Mitsui - TOYO Consortium
Key Designer : TOYO
Source of Fund : Japanese Bank of International Corporation
Consultant : Burns and Roe Enterprises, Inc.
Start Date : January 2002
Finish Date : October 2003
Key features of Work Scope:
The compressor station received natural gas from SOCAR treatment plant and delivered compressed natural gas into a 90 km long pipeline feeding the Severnaya Power Plant.
TML-Borova’s scope of work mainly comprised:
· Construction of the Compressor station that consisted of:
· Two gas turbine driven (approx. 11 MW each) compressors each rated at 5 million m3 /day at 37 barg discharge pressure to deliver natural gas to the Severnaya Power Plant,
· Air/Gas coolers for intermediate and after cooling,
· Emergency auxiliary diesel/gas generator set,
· High voltage electrical connection to the power supply including the aerial line connection and high voltage switching system,
· Microprocessor based automatic control system,
· Required Auxiliaries.
· Major Civil Work Items:
· Mechanical Installation Work of nearly 600 tons (major items: Compressor& Blower of 200 tons, Air Fin Cooler of 200 tons, Vessel & Tanks of 120 tons, Platform of 50 tons),
· Electrical (90 km of cabling) and Instrumentation (500 no of indoor and outdoor instruments) Installation Works,
· Design, Supply and Installation of HVAC System, Telephone System, Lightning System, Steel Structure Erection,
· Supply of Electrodes, Paint, Cables, some Structural Steel and Architectural Materials,
· Assistance to Commissioning