Jetty 2 at Tobruk Terminal
Reconditioning of Jetty 2 at Tobruk Terminal
Client : AGOCO
Start Date : November 2008
Finish Date : August 2010
Key features of Work Scope:
Reconditioning of deck, structural and mechanical elements of Jetty 2 at Tobruk Terminal.
The scope of works included;
Each segment of the Jetty 2,
· Demolishing the trunkway and jetty neck concrete deck and replace all with prefabricated reinforced concrete deck elements,
· Repairing the deck concrete of jetty head,
· Overhauling and painting of 4 nos of loading arms on the jetty head,
· Renewal of concrete supports of loading pipes on the jetty head,
· Demolition and reconstruction of 5 reinforced concrete mooring dolphins,
· Repairing of piles under mooring dolphins,
· Replacement of capstans on mooring dolphins,
· Renewal of wooden and rubber fenders on breasting and mooring dolphins,
· Renewal of buffer and hinge system of breasting dolphins,
· Grit blasting and painting of all steel structures,
· Renewal of lighting system,
· Replacement of all fastening elements of steel structures,
· Renewal of HDG cable trays and cable tray supports,
· Replacement of all gratings and handrails.
Shore approach, Jetty 1 & Jetty 2,
· Removal of existing fire fighting system,
· Designing a new fire fighting system for both jetties suitable for tankers with 300 m hull length,
· Installation of new fire fighting system with GRE pipes,
· Sand blasting and painting of 34” loading, 24” blast and 6” recovery oil lines of the whole jetty,
· Sand blasting and painting of all piles of the whole jetty parts.