Severnaya Power Plant
Severnaya 400 MW Gas Combined Cycyle Power Plant
Client : Azerenergy
Main Contractor : Mitsui - Mitsubishi Heavy Industries Consortium
Key Designer : Mitsubishi Heavy Industries
Consultant : Burns and Roe Enterprises, Inc.
Start Date : September 2000
Finish Date : November 2002
Key features of Work Scope:
Civil, Mechanical, Electrical and Tank Construction Works.
TML, as the leader and sponsor of the TML-Borova Joint-Venture, was entrusted with the main subcontract to execute all civil works, water intake, mechanical, electrical, instrumentation works and a 3 km railway extention.
The works to be performed for the completion of this project were;
Construction Works:
Turbine & Generator Building, Turbine & Generator Pedestals, HRSG Foundatin, Tank Foundations, Ancilliary Equipment foundations, Wate & Waste Water Treatment Buildings, Pump Pit & Pump House, Auxilliary buildings.
Major Civil Works:
RC Piles (400 mm square, 14 M deep); 100.000 m3 Earthworks, 20.000 m3 Reinforced Concrete, 2.000 Tons of Reinforcement, 40.000 m2 Formwork, 2.000 tons of Steel Structure, 1.500 m Concrete Coated Steel Pipe in 1800 mm diameter, 7.000 m2 Asphalt Works, 3.000 m2 Dredging.
Marine Works:
Cooling Water Intake Channel, Discharge Outfall, Breakwater Structure.
Railway Works:
Design, Supply and Construction of 3 km Railroad.
Mechanical Installation Works:
Gas Turbine – 370 tons, Steam Turbine - 340 tons, Generator - 300 tons, HRSG – 1.615 tons, Piping – 3.000 tons.
Electrical Installation Works:
Cabling 550 km, Installation of Instrumentation (Indoor and Outdoor 3000 nos.)
Design, Supply & Installation of:
HVAC System, Telephone System, Lightning System, Well Water Supply System, Sewage Treatment Equipment, Dredging Equipment.
Design, Supply and Erection of Tanks:
10.000 m3 Condensate Storage Tank, 5.000 m3 Fuel Storage Tank, 2.000 m3 Fire Water Tank, 200 m3 Well Water Tank, 60 m3 Potable Water Tank, Lube Oil Tank.
Supply of:
Electrodes, Paint, Cables, Structural Steel, Ironmongery, Architectural Materials.