INDUSTRIAL PROCESS

Baku Shipyard Project


Baku Shipyard Project

Client : BAKU SHIPYARD LLC

Consultant : ROYAL HASKONING

Main Contractor : SOCAR NEFTGAZ TIKINTI

Key Designer : ENCOTEC

Start Date : February 2012

Finish Date : September 2013

Key features of Work Scope:
Construction of 4 buildings in Baku Shipyard Project, total closed area is 44.100 m². Two steel structure buildings (28.220 m²) and three reinforced concrete buildings (15.880 m²)
The project consists of the construction of two steel structure and 3 reingforced concrete buildings which is located in Baku.
The building has a total area of 44.100 sqm.

The buildings are :
         · Steel Fabricating Workshops (Building no. 3,), steel structure, 26.780 sqm
         · Changing Rooms & Canteen (Building no. 11 & 16), reinforced concrete structure, 5.916 sqm
         · Main Office & Medical Center (Building no. 12&25), reinforced concrete structure, 5.508 sqm
         · Training Center (Building no. 27), steel structure, 1.440 sqm
         · Office for Surveyors (Building no. 28), reinforced concrete structue, 4.456 sqm

The necessary works to be done for the completion of the project are:
         · Construction of reinforced concrete and steel structural system,
         · Execution of roof finishing and facade finishing works of the building;
         · Installation of all electrical systems of the buildings;
         · Installation of  all mechanical systems (HVAC, plumbing, sanitation systems) of the buildings;
         · Execution of finishing works;
         · Kitchen Equipment for the Canteen