![]() | LISCO Bar Rolling Project |
![]() | Baku Shipyard Project |
![]() | Severnaya Power Plant |
![]() | Gas Compressor Station |
![]() | Marine Works in Mostaganem |
![]() | Jetty 2 at Tobruk Terminal |
![]() | Offshore Works Of Doha Plant |
![]() | Jetty at Tobruk Terminal |
![]() | ACG Topside Fab. Yards - 2 |
![]() | ACG Onshore Terminal-1 |
![]() | BP Warehouse Erection Works |
![]() | Sangachal Tank Construction |
![]() | Foça WWTP& Sea Outfall |
![]() | Supsa Oil Terminal |
![]() | ACG Tank Farm Construction-1 |
![]() | Abu Taraba Desalination |
![]() | Tank Refurbishment Project |
![]() | Misurata Oil Jetty Project |
![]() | ACG Tank Farm Construction-1 |
![]() | Shah Deniz Gas Export |
![]() | ACG Onshore Terminal-2 |
![]() | ACG Topside Fab. Yards - 1 |
|
Baku Shipyard ProjectBaku Shipyard Project Client : BAKU SHIPYARD LLC Consultant : ROYAL HASKONING Main Contractor : SOCAR NEFTGAZ TIKINTI Key Designer : ENCOTEC Start Date : February 2012 Finish Date : September 2013 Key features of Work Scope: Construction of 4 buildings in Baku Shipyard Project, total closed area is 44.100 m². Two steel structure buildings (28.220 m²) and three reinforced concrete buildings (15.880 m²) The project consists of the construction of two steel structure and 3 reingforced concrete buildings which is located in Baku. The building has a total area of 44.100 sqm. The buildings are : · Steel Fabricating Workshops (Building no. 3,), steel structure, 26.780 sqm · Changing Rooms & Canteen (Building no. 11 & 16), reinforced concrete structure, 5.916 sqm · Main Office & Medical Center (Building no. 12&25), reinforced concrete structure, 5.508 sqm · Training Center (Building no. 27), steel structure, 1.440 sqm · Office for Surveyors (Building no. 28), reinforced concrete structue, 4.456 sqm The necessary works to be done for the completion of the project are: · Construction of reinforced concrete and steel structural system, · Execution of roof finishing and facade finishing works of the building; · Installation of all electrical systems of the buildings; · Installation of all mechanical systems (HVAC, plumbing, sanitation systems) of the buildings; · Execution of finishing works; · Kitchen Equipment for the Canteen
|