![]() | LISCO Bar Rolling Project |
![]() | Baku Shipyard Project |
![]() | Severnaya Power Plant |
![]() | Gas Compressor Station |
![]() | Marine Works in Mostaganem |
![]() | Jetty 2 at Tobruk Terminal |
![]() | Offshore Works Of Doha Plant |
![]() | Jetty at Tobruk Terminal |
![]() | ACG Topside Fab. Yards - 2 |
![]() | ACG Onshore Terminal-1 |
![]() | BP Warehouse Erection Works |
![]() | Sangachal Tank Construction |
![]() | Foça WWTP& Sea Outfall |
![]() | Supsa Oil Terminal |
![]() | ACG Tank Farm Construction-1 |
![]() | Abu Taraba Desalination |
![]() | Tank Refurbishment Project |
![]() | Misurata Oil Jetty Project |
![]() | ACG Tank Farm Construction-1 |
![]() | Shah Deniz Gas Export |
![]() | ACG Onshore Terminal-2 |
![]() | ACG Topside Fab. Yards - 1 |
|
Jetty 2 at Tobruk TerminalReconditioning of Jetty 2 at Tobruk Terminal Client : AGOCO Start Date : November 2008 Finish Date : August 2010 Key features of Work Scope: Reconditioning of deck, structural and mechanical elements of Jetty 2 at Tobruk Terminal. The scope of works included; Each segment of the Jetty 2, · Demolishing the trunkway and jetty neck concrete deck and replace all with prefabricated reinforced concrete deck elements, · Repairing the deck concrete of jetty head, · Overhauling and painting of 4 nos of loading arms on the jetty head, · Renewal of concrete supports of loading pipes on the jetty head, · Demolition and reconstruction of 5 reinforced concrete mooring dolphins, · Repairing of piles under mooring dolphins, · Replacement of capstans on mooring dolphins, · Renewal of wooden and rubber fenders on breasting and mooring dolphins, · Renewal of buffer and hinge system of breasting dolphins, · Grit blasting and painting of all steel structures, · Renewal of lighting system, · Replacement of all fastening elements of steel structures, · Renewal of HDG cable trays and cable tray supports, · Replacement of all gratings and handrails. Shore approach, Jetty 1 & Jetty 2, · Removal of existing fire fighting system, · Designing a new fire fighting system for both jetties suitable for tankers with 300 m hull length, · Installation of new fire fighting system with GRE pipes, · Sand blasting and painting of 34” loading, 24” blast and 6” recovery oil lines of the whole jetty, · Sand blasting and painting of all piles of the whole jetty parts.
|