LISCO Bar Rolling Project |
Baku Shipyard Project |
Severnaya Power Plant |
Gas Compressor Station |
Marine Works in Mostaganem |
Jetty 2 at Tobruk Terminal |
Offshore Works Of Doha Plant |
Jetty at Tobruk Terminal |
ACG Topside Fab. Yards - 2 |
ACG Onshore Terminal-1 |
BP Warehouse Erection Works |
Sangachal Tank Construction |
Foça WWTP& Sea Outfall |
Supsa Oil Terminal |
ACG Tank Farm Construction-1 |
Abu Taraba Desalination |
Tank Refurbishment Project |
Misurata Oil Jetty Project |
ACG Tank Farm Construction-1 |
Shah Deniz Gas Export |
ACG Onshore Terminal-2 |
ACG Topside Fab. Yards - 1 |
|
Sangachal Tank ConstructionSangachal Terminal 2nd Produced Water Tank Construction Client : Azerbaijan International Operating Company (AIOC) Main Contractor : Entrepose Contracting S.A. Start Date : February 2007 Finish Date : March 2008 Key features of Work Scope: Erection works of the 2nd Produced Water Tank, The subject tank has 21,000 m3 capacity with 21 m height and 37,8 m diameter. TML was responsible for all necessary construction, erection and testing including but not limited to the supply of all transport, storage, handling, preservation, temporary piping, seals, erection, welding, dimensional control, inspection, testing, non-destructive testing, final testing and pre-commissioning, provision of test mediums (excluding hydrotest water), disposal of waste, removal of scrap, removal of surplus materials, material re-conciliation, re-instatement of the site, as-built drawings and dossiers. The permanent works included the items listed below: · Unloading, storage and preservation of all contractor provided items, · Turning the annular and bottom plates of 180° to maintain permanently their painted side on the foundations bed, · Erection, welding and examination of the tank annular plates, · Erection, welding and examination of the tank bottom plates, · Erection, welding and examination of the tank shell plates, · Erection, welding and examination of the tank roof plates, · Erection, welding and examination of the tank compression ring, · Erection, welding and examination of the tank shell nozzles, · Erection, welding and examination of the tank roof nozzles, · Erection, welding and examination of the tank roof framing, the tank roof center ring and the tank roof accessories, · Installation and examination of tank helicoidal stairway, ladders, center platform, upper platform, lower platform, · Installation and examination of internal piping, anodes pads, oil skimmer, and all mechanical internal equipment, · Installation and examination of anchors, earthings, nameplate and all mechanical external equipment.
|