LISCO Bar Rolling Project |
Baku Shipyard Project |
Severnaya Power Plant |
Gas Compressor Station |
Marine Works in Mostaganem |
Jetty 2 at Tobruk Terminal |
Offshore Works Of Doha Plant |
Jetty at Tobruk Terminal |
ACG Topside Fab. Yards - 2 |
ACG Onshore Terminal-1 |
BP Warehouse Erection Works |
Sangachal Tank Construction |
Foça WWTP& Sea Outfall |
Supsa Oil Terminal |
ACG Tank Farm Construction-1 |
Abu Taraba Desalination |
Tank Refurbishment Project |
Misurata Oil Jetty Project |
ACG Tank Farm Construction-1 |
Shah Deniz Gas Export |
ACG Onshore Terminal-2 |
ACG Topside Fab. Yards - 1 |
|
Severnaya Power PlantSevernaya 400 MW Gas Combined Cycyle Power Plant Client : Azerenergy Main Contractor : Mitsui - Mitsubishi Heavy Industries Consortium Key Designer : Mitsubishi Heavy Industries Consultant : Burns and Roe Enterprises, Inc. Start Date : September 2000 Finish Date : November 2002 Key features of Work Scope: Civil, Mechanical, Electrical and Tank Construction Works. TML, as the leader and sponsor of the TML-Borova Joint-Venture, was entrusted with the main subcontract to execute all civil works, water intake, mechanical, electrical, instrumentation works and a 3 km railway extention. The works to be performed for the completion of this project were; Construction Works: Turbine & Generator Building, Turbine & Generator Pedestals, HRSG Foundatin, Tank Foundations, Ancilliary Equipment foundations, Wate & Waste Water Treatment Buildings, Pump Pit & Pump House, Auxilliary buildings. Major Civil Works: RC Piles (400 mm square, 14 M deep); 100.000 m3 Earthworks, 20.000 m3 Reinforced Concrete, 2.000 Tons of Reinforcement, 40.000 m2 Formwork, 2.000 tons of Steel Structure, 1.500 m Concrete Coated Steel Pipe in 1800 mm diameter, 7.000 m2 Asphalt Works, 3.000 m2 Dredging. Marine Works: Cooling Water Intake Channel, Discharge Outfall, Breakwater Structure. Railway Works: Design, Supply and Construction of 3 km Railroad. Mechanical Installation Works: Gas Turbine – 370 tons, Steam Turbine - 340 tons, Generator - 300 tons, HRSG – 1.615 tons, Piping – 3.000 tons. Electrical Installation Works: Cabling 550 km, Installation of Instrumentation (Indoor and Outdoor 3000 nos.) Design, Supply & Installation of: HVAC System, Telephone System, Lightning System, Well Water Supply System, Sewage Treatment Equipment, Dredging Equipment. Design, Supply and Erection of Tanks: 10.000 m3 Condensate Storage Tank, 5.000 m3 Fuel Storage Tank, 2.000 m3 Fire Water Tank, 200 m3 Well Water Tank, 60 m3 Potable Water Tank, Lube Oil Tank. Supply of: Electrodes, Paint, Cables, Structural Steel, Ironmongery, Architectural Materials.
|