Repair Works of LISCO in Libya |
Offshore Works Of Doha Plant |
LISCO Bar Rolling Project |
Baku Gateway Building |
Misurata Berths Project |
Baku Shipyard Project |
Misurata Traffic Police Station |
Jetty 2 at Tobruk Terminal |
Construction of Bulk Berth No.2 and Loading Berth |
Tobruk Al Massira Hotel |
Misurata Oil Jetty Project |
Repairing of The Berths No.15-33 at Tripoli Harbor |
Baku Clock Towers Project |
Al Fateh Hospital Project |
BP Warehouse Erection Works |
Baku Nizami Residences |
Jetty at Tobruk Terminal |
Sangachal Tank Construction |
City Gardens Project |
Nergiz Shopping Center |
Tank Refurbishment Project |
Abu Taraba Desalination |
Omar Al Mokhtar University Project |
GMRA Cathodic Protection 2 |
ACG Tank Farm Construction-1 |
ACG Tank Farm Construction-1 |
Bab El Bahr Hotel |
Shah Deniz Gas Export |
ACG Topside Fab. Yards - 1 |
ACG Topside Fab. Yards - 2 |
Misurata Steel Harbour |
Breakwater Crown Wall |
Foça WWTP& Sea Outfall |
Gas Compressor Station |
GMRA Cathodic Protection |
Severnaya Power Plant |
ACG Onshore Terminal-2 |
ACG Onshore Terminal-1 |
Supsa Oil Terminal |
Caspian Training Center |
Dobrinja Rehabilitation Center |
ISR Business Center |
TML Headquarters-Kavacik |
Azer Yapi Market |
Baku Supermarket Project |
TML Headquarters-Nakkastepe |
|
Caspian Training CenterCaspian Training Center Client : Schlumberger, SOSA Key Designer : Erginoglu Calislar Architecture Consultant : Erginoglu Calislar Architecture Start Date : October 1999 Finish Date : April 2000 Key features of Work Scope: The modern training facility is the one with the most futuristic facade design in Baku utilizing aluminum cladding, and Client’s colors. The facility is approximately 2000 m2 in three storeys, including service building located at 25 km from Baku to west, 100 m away from sea shore. The building includes offices, laboratory, canteen and a conference hall. The facility is fully climatisized with one line system fan-coils. It has full back-up generator, a huge water tank and 50 cars parking place.
|