Repair Works of LISCO in Libya |
Offshore Works Of Doha Plant |
LISCO Bar Rolling Project |
Baku Gateway Building |
Misurata Berths Project |
Baku Shipyard Project |
Misurata Traffic Police Station |
Jetty 2 at Tobruk Terminal |
Construction of Bulk Berth No.2 and Loading Berth |
Tobruk Al Massira Hotel |
Misurata Oil Jetty Project |
Repairing of The Berths No.15-33 at Tripoli Harbor |
Baku Clock Towers Project |
Al Fateh Hospital Project |
BP Warehouse Erection Works |
Baku Nizami Residences |
Jetty at Tobruk Terminal |
Sangachal Tank Construction |
City Gardens Project |
Nergiz Shopping Center |
Tank Refurbishment Project |
Abu Taraba Desalination |
Omar Al Mokhtar University Project |
GMRA Cathodic Protection 2 |
ACG Tank Farm Construction-1 |
ACG Tank Farm Construction-1 |
Bab El Bahr Hotel |
Shah Deniz Gas Export |
ACG Topside Fab. Yards - 1 |
ACG Topside Fab. Yards - 2 |
Misurata Steel Harbour |
Breakwater Crown Wall |
Foça WWTP& Sea Outfall |
Gas Compressor Station |
GMRA Cathodic Protection |
Severnaya Power Plant |
ACG Onshore Terminal-2 |
ACG Onshore Terminal-1 |
Supsa Oil Terminal |
Caspian Training Center |
Dobrinja Rehabilitation Center |
ISR Business Center |
TML Headquarters-Kavacik |
Azer Yapi Market |
Baku Supermarket Project |
TML Headquarters-Nakkastepe |
|
GMRA Cathodic ProtectionGreat Man Made River Poject, Sarir-Sirt-Tazerbo-Benghazi External Cathodic Protection Works Client : GMRA Main Contractor : Marubeni Corporation Start Date : November 2002 Finish Date : August 2003 Key features of Work Scope: Drilling holes of 10 meters and placing anodes of 28.000 nos along the pipe route and 287 km cable. The project was the installation of cathodic protection system against corrosion of the 4 m diameter pre-stressed concrete pipe line conveying drinkable water from Libyan Desert to seashore. The works consisted of installation of 24.175 zinc anodes and laying of 266.000 m of cable. The location of the project is between Jalu and Sarir, about 250-400 km south of the city of Ajdabia on the Mediterranean coast. Scope of work consisted of: · Supply and mobilization of mobile camp facilities, · Drilling of 24.175 nos 8,9 m holes, installation of zinc anodes and pumping of chemical backfill, · Laying of 266.000 header cable including opening of 1,5 m wide, 1,5 m deep trench, laying sand bedding, laying the cable, laying the sand cover, and backfilling the rest with the existing material and compaction, · Performance of all tests regarding these works.
|