Repair Works of LISCO in Libya |
Offshore Works Of Doha Plant |
LISCO Bar Rolling Project |
Baku Gateway Building |
Misurata Berths Project |
Baku Shipyard Project |
Misurata Traffic Police Station |
Jetty 2 at Tobruk Terminal |
Construction of Bulk Berth No.2 and Loading Berth |
Tobruk Al Massira Hotel |
Misurata Oil Jetty Project |
Repairing of The Berths No.15-33 at Tripoli Harbor |
Baku Clock Towers Project |
Al Fateh Hospital Project |
BP Warehouse Erection Works |
Baku Nizami Residences |
Jetty at Tobruk Terminal |
Sangachal Tank Construction |
City Gardens Project |
Nergiz Shopping Center |
Tank Refurbishment Project |
Abu Taraba Desalination |
Omar Al Mokhtar University Project |
GMRA Cathodic Protection 2 |
ACG Tank Farm Construction-1 |
ACG Tank Farm Construction-1 |
Bab El Bahr Hotel |
Shah Deniz Gas Export |
ACG Topside Fab. Yards - 1 |
ACG Topside Fab. Yards - 2 |
Misurata Steel Harbour |
Breakwater Crown Wall |
Foça WWTP& Sea Outfall |
Gas Compressor Station |
GMRA Cathodic Protection |
Severnaya Power Plant |
ACG Onshore Terminal-2 |
ACG Onshore Terminal-1 |
Supsa Oil Terminal |
Caspian Training Center |
Dobrinja Rehabilitation Center |
ISR Business Center |
TML Headquarters-Kavacik |
Azer Yapi Market |
Baku Supermarket Project |
TML Headquarters-Nakkastepe |
|
Nergiz Shopping CenterNergiz Shopping Center Project Client : ISR Investments CO. MMC. Key Designer : IM Construction & Trade Start Date : February 2006 Finish Date : June 2007 Key features of Work Scope: The project consisted of a steel structure construction (on existing two storey reinforced car park), electrical and mechanical works of a shopping mall which is located in Baku. The building consists of 4 storey and total covered area is 8.000 sqm. The work covered steel construction, common areas (excluding shops) and facade architectural finishing works, mechanical, electrical and landscaping works. The scope of work included the items listed below; · Construction of steel structure system, · Execution of roof finishing works, · Installation of all electrical systems; · Installation of all mechanical systems; · Execution of all exterior finishing works; · Execution of common areas interior finishing works
|