Repair Works of LISCO in Libya |
Offshore Works Of Doha Plant |
LISCO Bar Rolling Project |
Baku Gateway Building |
Misurata Berths Project |
Baku Shipyard Project |
Misurata Traffic Police Station |
Jetty 2 at Tobruk Terminal |
Construction of Bulk Berth No.2 and Loading Berth |
Tobruk Al Massira Hotel |
Misurata Oil Jetty Project |
Repairing of The Berths No.15-33 at Tripoli Harbor |
Baku Clock Towers Project |
Al Fateh Hospital Project |
BP Warehouse Erection Works |
Baku Nizami Residences |
Jetty at Tobruk Terminal |
Sangachal Tank Construction |
City Gardens Project |
Nergiz Shopping Center |
Tank Refurbishment Project |
Abu Taraba Desalination |
Omar Al Mokhtar University Project |
GMRA Cathodic Protection 2 |
ACG Tank Farm Construction-1 |
ACG Tank Farm Construction-1 |
Bab El Bahr Hotel |
Shah Deniz Gas Export |
ACG Topside Fab. Yards - 1 |
ACG Topside Fab. Yards - 2 |
Misurata Steel Harbour |
Breakwater Crown Wall |
Foça WWTP& Sea Outfall |
Gas Compressor Station |
GMRA Cathodic Protection |
Severnaya Power Plant |
ACG Onshore Terminal-2 |
ACG Onshore Terminal-1 |
Supsa Oil Terminal |
Caspian Training Center |
Dobrinja Rehabilitation Center |
ISR Business Center |
TML Headquarters-Kavacik |
Azer Yapi Market |
Baku Supermarket Project |
TML Headquarters-Nakkastepe |
|
Omar Al Mokhtar University ProjectOmar Al Mokhtar University Project Client : Organization for the Development of Administrative Centers Start Date : January 2004 Finish Date : August 2006 Key features of Work Scope: The project consisted of completing the construction work of two buildings for Baida Omar Mokhtar University which are located inside the university campus in the city of Al-Baida which is close to the Northeastern shore of Libya. The two 4 storey buildings are almost same in design and each of the buildings are approximately 12.500 m2. The necessary works to be done for the completion of the project are: · Surveying the already existing structure and finding and repairing any damaged structures, · Completion of the unfinished concrete work, · Installation of all electrical systems, · Installation of all mechanical systems (HVAC, plumbing, sanitation and sewage systems), · Execution of all interior finishing works of the two buildings (doors, windows, plaster, paint, marble, staircovers, floor tiles), · Execution of all exterior finishing works of the two buildings ( paint, stone, roof tiles), · Landscaping |