Repair Works of LISCO in Libya |
Offshore Works Of Doha Plant |
LISCO Bar Rolling Project |
Baku Gateway Building |
Misurata Berths Project |
Baku Shipyard Project |
Misurata Traffic Police Station |
Jetty 2 at Tobruk Terminal |
Construction of Bulk Berth No.2 and Loading Berth |
Tobruk Al Massira Hotel |
Misurata Oil Jetty Project |
Repairing of The Berths No.15-33 at Tripoli Harbor |
Baku Clock Towers Project |
Al Fateh Hospital Project |
BP Warehouse Erection Works |
Baku Nizami Residences |
Jetty at Tobruk Terminal |
Sangachal Tank Construction |
City Gardens Project |
Nergiz Shopping Center |
Tank Refurbishment Project |
Abu Taraba Desalination |
Omar Al Mokhtar University Project |
GMRA Cathodic Protection 2 |
ACG Tank Farm Construction-1 |
ACG Tank Farm Construction-1 |
Bab El Bahr Hotel |
Shah Deniz Gas Export |
ACG Topside Fab. Yards - 1 |
ACG Topside Fab. Yards - 2 |
Misurata Steel Harbour |
Breakwater Crown Wall |
Foça WWTP& Sea Outfall |
Gas Compressor Station |
GMRA Cathodic Protection |
Severnaya Power Plant |
ACG Onshore Terminal-2 |
ACG Onshore Terminal-1 |
Supsa Oil Terminal |
Caspian Training Center |
Dobrinja Rehabilitation Center |
ISR Business Center |
TML Headquarters-Kavacik |
Azer Yapi Market |
Baku Supermarket Project |
TML Headquarters-Nakkastepe |
|
Dobrinja Rehabilitation CenterDobrinja V Settlement, Sarajevo Medical Rehabilitation Center, Fojnica Client : Ministry of Foreign Trade and Economic Relations Consultant : Sarajevostan & Konimpex Start Date : July 1998 Finish Date : April 1999 Key features of Work Scope: Repair, Rehabilitation and Reconstruction of Dobrinja V High-rise complex apartments in Sarajevo and the Medical Rehabilitation Center in Fojnica. The project included repair, rehabilitation and reconstruction of the housing complex having total area of 46.026 sqm and the medical center having total area of 11.935 sqm. The scope of works included the following items; · Housing Repair, rehabilitation and reconstruction of 19.812 sqm, 358 flats heavily damaged buildings and 26.214 sqm, 492 flats lightly damaged buildings. · Medical Center Repair and rehabilitation of 8.200 sqm total area, 385 room, and 636 bed capacity main Medical Rehabilitation Building. · Reconstruction and rehabilitation of 4.300 sqm total area, 77 room, and 175 bed capacity Special Hospital Building. · Construction of 375 sqm area Hospital Management Office Heating Center.
|