Repair Works of LISCO in Libya |
Offshore Works Of Doha Plant |
LISCO Bar Rolling Project |
Baku Gateway Building |
Misurata Berths Project |
Baku Shipyard Project |
Misurata Traffic Police Station |
Jetty 2 at Tobruk Terminal |
Construction of Bulk Berth No.2 and Loading Berth |
Tobruk Al Massira Hotel |
Misurata Oil Jetty Project |
Repairing of The Berths No.15-33 at Tripoli Harbor |
Baku Clock Towers Project |
Al Fateh Hospital Project |
BP Warehouse Erection Works |
Baku Nizami Residences |
Jetty at Tobruk Terminal |
Sangachal Tank Construction |
City Gardens Project |
Nergiz Shopping Center |
Tank Refurbishment Project |
Abu Taraba Desalination |
Omar Al Mokhtar University Project |
GMRA Cathodic Protection 2 |
ACG Tank Farm Construction-1 |
ACG Tank Farm Construction-1 |
Bab El Bahr Hotel |
Shah Deniz Gas Export |
ACG Topside Fab. Yards - 1 |
ACG Topside Fab. Yards - 2 |
Misurata Steel Harbour |
Breakwater Crown Wall |
Foça WWTP& Sea Outfall |
Gas Compressor Station |
GMRA Cathodic Protection |
Severnaya Power Plant |
ACG Onshore Terminal-2 |
ACG Onshore Terminal-1 |
Supsa Oil Terminal |
Caspian Training Center |
Dobrinja Rehabilitation Center |
ISR Business Center |
TML Headquarters-Kavacik |
Azer Yapi Market |
Baku Supermarket Project |
TML Headquarters-Nakkastepe |
|
TML Headquarters-NakkastepeTML Headquarters, Nakkastepe-Istanbul Client : TML Start Date : June 1992 Finish Date : October 1993 Key features of Work Scope: Reconstruction of an old Turkish mansion which was burned down in the 30’s as a modern office building of 1000 m2 and construction of two annex buildings of 150 m2 each. The main building preserves the design of the Old Mansion and consists of four floors.
|